Energy use in public buildings — Technical https://thesis.uya.no/proposals/a-smarter-building-day/#technical-track BACHELOR Final result: A reproducible dashboard with a basic forecast evaluation. Task: Build a building-energy dashboard with the established same-hour-last-week forecast. Data: Building Data Genome 2: electricity, 2016–2017 (public) First 10 office buildings by ID with ≥90% observed 2016 readings. Publish IDs before opening 2017 outcomes. Train on 2016; score observed 2017 hours. Requires: Recruit facility managers for the decision study; no energy-saving claim. Method: Use the specified BDG2 meters; report forecast error and missing-data coverage, then observe facilities tasks. Plan 4 participant sessions. STEPS Build and test 1. Read the starting sources and choose one established implementation method. 2. Write the requirements, data fields, system diagram and test cases. 3. Prepare Building Data Genome 2: electricity, 2016–2017. Make the answer key and pass criteria before testing. 4. Build a working version of a reproducible dashboard with a basic forecast evaluation. 5. Run function, integration and failure-case tests. Record each result. 6. Run the practical evaluation and list the changes the system still needs. MASTER Final result: Forecast dashboard, data-preparation script and benchmark. Research question: Investigate when a better energy forecast produces a better facilities decision. Compare the specified forecasting baselines and isolate missing-data disclosure in the interface; analyse forecast error separately from justified action. Research result: Evidence connecting data quality, forecast evaluation and operational interpretation. STEPS Design, build and test (DSR) 1. Read the newest papers and list the closest existing systems. 2. Write down the versions, fields, data split, case assignment, random seeds and correct answers for Building Data Genome 2: electricity, 2016–2017. 3. Draw the user workflow, data model and system architecture. List the requirements and pass criteria. 4. Build a working version of forecast dashboard, data-preparation script and benchmark. 5. Test every function, connection and failure case. Save the failed tests as well as the passed tests. 6. Compare the system with the named alternative. Then run the user task or decision task in the assignment. 7. Report the measured result, the failed cases and the design lessons another team can reuse. CURRENT PROJECT LITERATURE Decision making about increased building automation — barriers, drivers and motivation factors (2025, peer-reviewed): https://doi.org/10.3389/fenrg.2024.1498140 Connects building automation data to facilities roles, decisions and implementation barriers. A Dynamic Digital Twin Framework for Sustainable Facility Management in a Smart Campus: A Case Study of Chiang Mai University (2025, peer-reviewed): https://doi.org/10.3390/technologies13100439 Demonstrates current integration of operational data, interfaces and facility-management use. IS THEORY STARTING POINTS Wang & Strong (1996) — Beyond Accuracy: https://www.tandfonline.com/doi/abs/10.1080/07421222.1996.11518099 Distinguish accuracy, completeness, representation and fitness for the task. Vessey & Galletta (1991) — Cognitive Fit: https://pubsonline.informs.org/doi/10.1287/isre.2.1.63 Test whether a representation helps one kind of task more than another. Search Scopus or Web of Science and ACM Digital Library using the topic query, then follow citations to the thesis start date. Record searches and compare methods, data, findings and limitations in literature-matrix.csv. Use that review to confirm or revise the gap and choose a current comparator. The linked papers are starting points. PILOT QUESTION Do forecast and missing-data displays help facility managers identify periods that need investigation? EXAMPLE TOOLS Python, pandas, scikit-learn, Streamlit Equivalent tools are fine. FIRST THREE ACTIONS 1. Download BDG2 metadata and electricity readings; record the repository revision. 2. Select office buildings by 2016 coverage only and finalise their IDs before examining 2017 outcomes. 3. Plot one building and evaluate last-week forecasting before fitting regression. LITERATURE SEARCH building energy forecast facility manager information quality DATA Building Data Genome 2: electricity, 2016–2017 (public) First 10 office buildings by ID with ≥90% observed 2016 readings. Publish IDs before opening 2017 outcomes. Train on 2016; score observed 2017 hours. Building Data Genome 2: https://github.com/buds-lab/building-data-genome-project-2 HOW TO TEST IT Tune ridge alpha on chronological 2016 folds only; compare y[t−168] with ridge using hour, weekday and lags 24/168. On observed 2017 targets report per-building/horizon MAE, MASE, 80% interval coverage/width, target coverage and missing-lag rate. Six facilities staff review six non-overlapping cases; score gap recognition, justified investigate/verify/no-action decisions, source checks and time. FINAL RESULT Forecast dashboard, data-preparation script and benchmark. ACCESS OR PEOPLE Recruit 6 facility managers for the decision study; no energy-saving claim. TEMPLATES https://thesis.uya.no/starters/a-smarter-building-day/technical/data-plan.csv https://thesis.uya.no/starters/a-smarter-building-day/technical/evaluation.csv https://thesis.uya.no/starters/a-smarter-building-day/technical/literature-matrix.csv Use participant codes instead of names or email addresses.